2009 domestic requirements of expanding domestic demand, China\\ s rapid development, the biggest change is the change of
traffic every day highway in construction, crusherzy.com/key-impact-hammers-crusher-107/">impact crusher, the existence of this model greatly
Facilitate the construction workers, this had to back-breaking installation and maintenance to introduce.
The installation of the crusher (Impact Crusher)
Pump (1) crusher (impact crusher) with the vibration of the unit of work during installation and before the trial should
be tightening all fasteners should be checked regularly in the production operation, with the
When tightening.
(2) the installation should pay attention to the impact crusher rotation (standard pulleys spin to the arrow) is
irreversible.
(3) put the break motor installed, should be based on the installation, with the belt guard.
(4) the back plate and the board hammer gap should work need to gradually transfer a small application of hand, the
adjusted number of rotation of the rotor turn, check for collision. After adjustment, the locking sleeve nut to prevent the
back plate
Nut loose by the vibration gradually hammer relative to the collision with the plate, causing the accident.
(5) in the lower part of the discharge port of the crusher (Impact Crusher) mounting height as well as how to feed, a
feeding device with, should be considered in system design.
Maintenance of the crusher (Impact Crusher)
(1) counter-crusher (impact crusher) operation of the process should always be for a routine check, when abnormal sound
or bearing temperature is above 70 ℃, should immediately stop check in a timely manner to eliminate so the
Barrier in order to continue to boot.
(2) counter-attack to break in normal operation before feeding, the feeding should be uniform, iron hard object should be
to prevent mixing. Feeding must be stopped before shutting down, shut down within the material crushing is completed and then
stop the motor.
(3) crusher (Impact Crusher) after repair or adjustment of the discharge opening, the first use of human rotation of the
rotor, make sure the rotor and other parts there is no friction and stuck phenomena and the flexibility to rotate,
Before starting the motor.
(4) should always check the bearing seal is good, bearing grease should raise once a month, every three months should be
all clean oil changes and replacement of asphalt felt.
(5) Check for loose fasteners, should focus on checking the rotor on both sides of pressing plate hammer plate screw to
prevent the plate loose ends of the plate hammer to expose the rotor body and the body crashing, damage parts
.
(6) To ensure that the operating personnel and equipment safety, prohibited the operation of the machine repair, adjust,
and clean-up efforts to prohibit open a variety of small doors.
(7) When the impact crusher broken product particle size is too large, you should stop to check the board hammer wear, to
prevent the rotor is worn. When the board hammer again due to wear need to be adjusted 180 °, so that each plate
Equal to the hammer weight and to maintain a balance in order to prevent the back-breaking start vibration.